
Polyclinic which was half destroyed during shelling in summer, is partially reconstructed due to ICRC. Only reconstruction of the roof cost 100 000 UAH. Igor Grishko, ICRC and Vladimir Petrov, ICRC, inspect the progress of the reconstruction and what is still need, Luhansk region. Olga Slepets, head doctor of polyclinic 15.12.2014